Micro Hydro Electric Power Station – Scotland

Project Overview: A private developer initiated the construction of a Hydro Electric Power Station in Scotland. During the project, a potential dispute arose concerning disputed compensation events.
Client: Private Client
Location: Scottish Highlands
Start Date: 2019
Contract Value: Confidential

Challenges Faced: A dispute was escalating due to ignored provisions of the NEC contract and significant contractual shortcomings on both sides.

Resolution: An contract expert was appointed to analyse the situation and produce a comprehensive report. This report identified the provisions that should have been allowed and disallowed if the contract had been properly administered. This report served as the starting point for negotiations.

Outcome: Through a series of meetings involving the project managers, client, and contractor, an amicable settlement was reached. The settlement amount was acceptable to both parties, resolving the dispute effectively and the works were completed to a high standard.

testimonial

What Clients Are Saying...

Laura Palmer

FOUNDER

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock,

Jacob Hunderson

CEO

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock,

Daniil Silantev

DESIGNER

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock,

Mac Silverston

DEVELOPER

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock,