Dubai Aluminium, Kestrel Power Project

Project Overview: The Dubai Aluminium Smelter required a significant expansion to increase its production capacity by 30%. This expansion necessitated extensive upgrades to the existing infrastructure and power supply, including the provision of new substations, cabling, and trenching works.
Client: DUBAL
Location: Dubai
Start Date: 2007
Contract Value: US$ 172m

Challenges Faced: Negotiations with the Mechanical & Electrical (M&E) contractor on the Kestrel Power project in Dubai became contentious, particularly regarding the upgrades to the power supply.

Resolution: Assisted and supported the Commercial Manager representing the employer, DUBAL, conducted a thorough analysis of the contentious matters surrounding the power supply upgrade. This analysis enabled a clear contractual position to be established between the parties and fostered effective negotiation with the contractor.

Outcome: Through a series of meetings and negotiations, the settlement value of the final account was reduced by Dhs 30 million, achieving a favorable outcome for DUBAL.

testimonial

What Clients Are Saying...

Laura Palmer

FOUNDER

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock,

Jacob Hunderson

CEO

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock,

Daniil Silantev

DESIGNER

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock,

Mac Silverston

DEVELOPER

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock,